: 10mm spanner, Phillips and flathead screwdrivers, and a rubber mallet.
Installing a typically requires two adults and takes between 6 to 8 hours to complete . The process is most successful when performed on a dry, calm day to prevent wind from catching panels or the frame during construction. Essential Preparation
: A firm, level, and square base is non-negotiable. It is strongly recommended to use a solid concrete base or slabbed paving covering an area of at least 190 cm x 190 cm .
: Choose a sunny position shielded from strong winds and away from overhanging trees.
: Before starting, check all components against the parts list. Identifying and laying out pieces on a clean, flat surface can save hours of frustration later. Required Tools